Missouri State University, Darr Agriculture Center - Bond Learning Center
Building Type:
HIGHER EDUCATION
Services Provided:
SD-DD-CD Energy Modeling
LEED Documentation
Project Overview:
Location:
Springfield, MO
Area:
273,000 square feet
Awards:
LEED Silver
-
Challenge: An architecture/engineering firm created an energy model for this 30,000 square foot facility, but had trouble modeling its geothermal well field. Additionally, the model was built based on the original building floor plan, but an alternative design was later accepted that expanded the building size. The model either needed to be expanded as well, or a new model created. Decision makers wanted its staff to conduct the energy modeling , but were unable to dedicate the resources to train staff to do it efficiently.
Solution: ENERGY STUDIO was hired to revise the model to include the expanded area and the geothermal well field. Using the original modeling files developed by the architecture/engineering firm, we added the new components, a banquet facility and support spaces. Additionally, revisions to the model file, such as consolidating the schedules and developing a baseline consistent with the ASHRAE 90.1-2007 Appendix G requirements, were performed. ENERGY STUDIO will also provide the LEED-NC 2009 documentation for EA Prerequisite 2: Minimum Energy Performance and EA Credit 1: Optimized Energy Performance for this project.